Tiny house / sauna house with an open ceiling

Mök. Publica

PUBLICA is a stylish tiny house with a high ceiling and a spacious terrace, offering a smaller family the opportunity to escape the bustle of the city and enjoy peace in the heart of nature – complete with a relaxing sauna.

  • Total area 28.3 m²
  • External dimensions 6.88 x 6.13 m
  • Sauna room 4.2 m²
  • Terrace 17.8 m²
Price from54 900 €
Mök. Publica Mök. Publica Mök. Publica Mök. Publica Mök. Publica

Key features

  • Premium Nordic architecture
  • Suitable for year-round use
  • Energy-efficient construction with good thermal insulation
  • Triple-glazed energy-efficient windows
  • Well-planned ventilation and heating solutions
  • Durable, low-maintenance materials
  • Possibility to customize layouts and technical solutions

Gallery

Technical specifications

Building type Premium sauna house / tiny house with open ceiling
Building category Tiny house
Total area 28.3 m²
External dimensions 6 880 × 6 130 mm
Construction Timber frame
Exterior finish Corten steel, timber cladding, thermally modified wood, MOSO Bamboo or a combination of these materials.
Wall insulation 250 mm+ 45 mm mineral wool
Ventilation Forced ventilation with humidity sensor in wet rooms, heat recovery option in living spaces
Windows Triple-glazed energy-efficient glass units
Heating Air-to-water, air-to-air, water underfloor heating or another project-specific solution
Foundation Slab foundation or reinforced strip foundation
Electrical system Ready for electrical connection
Water and drainage readiness Yes
Living room / kitchen 16,2 m²
Sauna room 4,2 m²
Shower room 4,4 m²
WC 2,1 m²
Terrace 17,8 m²
Transport In modules

Plans and drawings

Finishes and optional extras

  • Different interior finish tones and materials
  • Terrace extensions and outdoor areas
  • LED lighting packages
  • Smart home systems
  • Solar panel readiness
  • Sauna and spa solutions

From order to installation

  1. 1 Design consultation and needs assessment
  2. 2 Order confirmation and design
  3. 3 Planning foundations and technical solutions
  4. 4 Factory production
  5. 5 Transport to site
  6. 6 Installation and connection