Family home with an upper floor

Mök. Sylva

SYLVA is a spacious and light-filled premium home designed for a large family. The upper floor provides additional space, flexible possibilities for use and a pleasantly open and airy atmosphere.

  • Total area 183 m²
  • External dimensions 16.93 × 9.00 m
  • Sauna room 4.5 m²
  • Terrace 47.5 m²
Price from220 000 €
Mök. Sylva Mök. Sylva Mök. Sylva Mök. Sylva Mök. Sylva

Key features

  • Premium Nordic architecture
  • Suitable for year-round use
  • Energy-efficient construction with excellent thermal insulation
  • Energy-efficient triple-glazed windows
  • Carefully designed ventilation and heating solutions
  • Durable, low-maintenance materials
  • Option to customise the floor plan and technical solutions

Gallery

Technical specifications

Building type Premium family home with an upper floor
Building category Detached house
Total area 183 m²
External dimensions 16,926 × 9,000 mm
Construction Timber frame
Exterior finish Corten steel, timber cladding, thermally modified wood, MOSO Bamboo or a combination of these materials.
Wall insulation 300 mm + 50 mm mineral wool
Ventilation Mechanical ventilation with heat recovery
Windows Energy-efficient triple-glazed insulating glass units
Heating Air-to-water heat pump, air-to-air heat pump, hydronic underfloor heating or another project-specific solution
Foundation Strip or slab foundation
Electrical system Complete electrical installation readiness
Sauna heater Electric or wood-burning
Water and sewer connection readiness Yes
Living room 17.2 m²
Kitchen / dining area 24.3 m²
Bedroom 1 14.2 m²
Bedroom 2 13.1 m²
Bedroom 3 13.8 m²
Bedroom 4 13.8 m²
Bedroom 5 30.5 m²
Terrace 47.5 m²
Transport As prefabricated building elements

Finishes and optional extras

  • Various interior finish colours and materials
  • Terrace extensions and outdoor areas
  • LED lighting packages
  • Smart home systems
  • Solar panel readiness
  • Sauna and spa solutions
  • Special solutions and floor plan modifications available upon request

From order to installation

  1. 1 Consultation and assessment of requirements
  2. 2 Order confirmation and design
  3. 3 Planning of the foundation and technical solutions
  4. 4 Factory production
  5. 5 Transport to the construction site
  6. 6 Installation and connection